The big legal question

Can an IBC Section 62 appeal survive beyond the 60-day and 28-day windows?

What this case means

A liquidator filed an appeal under Section 62 of the Insolvency and Bankruptcy Code 2016 before the Supreme Court beyond the maximum permissible period, and also failed to cure filing defects within 28 days. The Court held that once the statutory time window closes, it has no jurisdiction to condone delay. The judgment reinforces that IBC's strict timelines cannot be circumvented by filing defective appeals and curing defects at leisure.

“The Supreme Court dismissed a liquidator's IBC Section 62 appeal as time-barred, holding that once the 60-day filing and 28-day re-filing windows close, delay cannot be condoned under any circumstances.”

Share:

Story Slides

Case at a glance1 / 6

Supreme Court of India

IBC Section 62 Appeal Dismissed: Strict Limitation Bars Liquidator

CA Ramchandra Dallaram Choudhary vs Adani Infrastructure and Developers Pvt Ltd | 2026 INSC 629

Court: Supreme Court of India; Date: June 01, 2026Bench: Justice Dipankar Datta and Justice Satish Chandra SharmaArea of Law: Insolvency and Bankruptcy Law, LimitationAppeal filed 7 days late; re-filed 82 days after the 28-day SCR window closed
CA Ramchandra Dallaram Choudhary vs Adani Infrastructure and Developers Private Limited · 2026 INSC 629June 01, 2026
The legal question2 / 6

Can Re-Filing Delay in a Defective IBC Appeal Be Condoned?

Core legal question decided by the Court

  • Appellant: Liquidator is a neutral officer; re-filing delay standards are less rigorous than filing delay; SCR imposes no hard cap on re-filing delay.
  • Appellant: Earlier coordinate Bench condoned re-filing delay in same litigation; sufficient cause existed here too.
  • Respondent/Court: IBC's 60-day outer limit and 28-day SCR re-filing window together form an absolute bar.
  • Court: Once both windows are shut, the appeal stands extinguished; no application for condonation can arise.
CA Ramchandra Dallaram Choudhary vs Adani Infrastructure and Developers Private Limited · 2026 INSC 629June 01, 2026
Statutory comparison3 / 6

IBC Section 62 vs General Law: Limitation for Appeals

How IBC's strict scheme differs from general procedural laws

AspectIBC Section 62 (Special Law)General Law (CPC/CrPC/Constitution)
Filing period45 days from receipt of NCLAT orderVaries; governed by Limitation Act or specific provision
Grace periodMaximum 15 days on sufficient cause; absolute outer limit 60 daysCourt's discretion under Section 5, Limitation Act generally wider
Re-filing after curing defects28 days under SCR; no extension permissible in IBC context28 days under SCR; condonation discretionary and generally more liberal
Effect of breachAppeal extinguished; jurisdiction of Court ceasesCondonation possible on sufficient cause
IBC is a complete code: SCR as subordinate legislation cannot override its express time limits.
CA Ramchandra Dallaram Choudhary vs Adani Infrastructure and Developers Private Limited · 2026 INSC 629June 01, 2026
The Court's reasoning4 / 6

Court's Reasoning: Why the Appeal Was Dismissed

Step-by-step legal reasoning

  1. 1Step 1: Section 62 IBC sets an absolute outer limit of 60 days for filing; this is a jurisdictional bar, not a procedural one.
  2. 2Step 2: A defect-free appeal must be filed within 60 days; a defective appeal does not satisfy the limitation requirement.
  3. 3Step 3: SCR Order VIII Rule 6 allows 28 days to cure defects; in IBC Section 62 appeals, this window is also a hard limit.
  4. 4Step 4: Once both the 60-day and 28-day windows close, the appeal stands extinguished; no condonation application can lie.
  5. 5Step 5: IBC prevails over SCR in case of conflict; Article 142 cannot be invoked to override express statutory timelines.
CA Ramchandra Dallaram Choudhary vs Adani Infrastructure and Developers Private Limited · 2026 INSC 629June 01, 2026
The verdict5 / 6

The Verdict: Appeal Dismissed as Time-Barred

  • The Fact: Liquidator filed Section 62 IBC appeal 7 days late and re-filed 82 days beyond the 28-day SCR window.
  • The Law: Section 62 IBC and SCR Order VIII Rule 6 together impose an absolute jurisdictional bar once both windows expire.
  • The Result: Appeal dismissed as time-barred; both condonation applications rejected; all connected applications dismissed.
The defective appeal stands dismissed as time-barred having been filed beyond the maximum period condonable in terms of the IBC.
CA Ramchandra Dallaram Choudhary vs Adani Infrastructure and Developers Private Limited · 2026 INSC 629June 01, 2026
Why it matters6 / 6

What This Means for Litigants in IBC Cases

  • File IBC Section 62 appeals defect-free within 45 days; maximum 60 days is an absolute, non-extendable deadline.
  • If the Registry marks your appeal defective, cure all defects within 28 days — no extension is possible under IBC.
  • Filing a defective appeal to 'save limitation' and curing defects later is not permissible in IBC proceedings.
  • Even court-appointed officers like liquidators get no special exemption from IBC's strict time limits.
In IBC appeals, missed deadlines cannot be rescued by sympathy, seniority, or prior indulgence — the law is the law.
CA Ramchandra Dallaram Choudhary vs Adani Infrastructure and Developers Private Limited · 2026 INSC 629June 01, 2026

At a glance (infographic)

CA Ramchandra Dallaram Choudhary vs Adani Infrastructure and Developers Private Limited — infographic summary
Download infographic

In short

The Supreme Court dismissed an appeal filed by the liquidator of a corporate debtor under Section 62 of the Insolvency and Bankruptcy Code, 2016. The appeal was filed 7 days beyond the 45-day period but within the 60-day outer limit. It was, however, marked defective, and the liquidator took 82 additional days beyond the 28-day re-filing window under the Supreme Court Rules, 2013 to cure the defects. Two separate condonation applications were filed. The Court held that the IBC operates on a strict time-bound scheme. Under Section 62, an appeal must be filed within 45 days, with a maximum grace of 15 days upon sufficient cause. Curing of defects in a defective appeal is permitted within 28 days under Order VIII Rule 6 of the Supreme Court Rules, 2013. Once both these windows are shut, the Court has no jurisdiction to condone any further delay. The Court rejected the argument that the appellant, being a neutral liquidator acting for all stakeholders, deserved a more liberal treatment. It also declined to invoke Article 142 of the Constitution to override the statutory timeframes. The Court distinguished a prior coordinate Bench decision involving the same parties where re-filing delay before the NCLAT under Section 61 was condoned, noting that it was confined to peculiar facts and explicitly declared not to be a precedent. The Court further held that a litigant who has already availed indulgence at one appellate stage cannot claim serial condonations at successive stages. The appeal was dismissed as time-barred.

Background

The appellant, acting as liquidator of a corporate debtor, challenged a NCLAT order dated 8 December 2025 before the Supreme Court under Section 62 of the IBC. The appeal was filed 7 days late but within the 60-day outer limit; it was also marked defective by the Registry. After the defects were notified, the appellant took 82 additional days beyond the permitted 28-day window to re-file the corrected appeal.

The Decision

The Supreme Court dismissed the appeal as time-barred, holding that no condonation of delay is permissible once the 60-day filing window and the 28-day re-filing window under the SCR have both expired in the context of a Section 62 IBC appeal. Both the delay condonation application and the re-filing delay application were rejected, and all connected applications were also dismissed.

Why it matters for you

This judgment makes clear that under the IBC, there is a hard outer deadline of 60 days to file an appeal before the Supreme Court, and defects must be cured within 28 days thereafter; no court sympathy can extend these limits. Litigants, including court-appointed officers like liquidators, cannot use defective filings as a strategy to buy more time. The ruling also prevents serial condonations across successive appellate stages, protecting the IBC's core objective of time-bound resolution.

Relevant Legal Provisions

Key Acts and sections cited or relied upon in this judgment

“Section 62(1) allows an appeal to the Supreme Court within 45 days of receipt of the NCLAT order, and Section 62(2) permits a further grace period of only 15 days on sufficient cause shown; the Court held this 60-day outer limit is an absolute jurisdictional bar that cannot be extended.”
“Section 61 governs appeals to the NCLAT; the Court referred to it to reaffirm that limitation principles applicable under Section 62 are consistent with those under Section 61 as enunciated in prior decisions.”
“These sub-rules allow 28 days to cure defects in a defective appeal or petition; the Court held that in the context of Section 62 IBC appeals, this 28-day re-filing window is the outer limit and cannot be extended by a condonation application.”
“Article 142 grants the Supreme Court extraordinary power to do complete justice; the Court held that this power cannot be invoked to dilute or override the express statutory timeframes under the IBC, even for a neutral officer like a liquidator.”

Full text of the judgment

Text extracted from CA Ramchandra Dallaram Choudhary vs Adani Infrastructure and Developers Private Limited. For the authoritative version refer to the Supreme Court of India's official website.

2026 INSC 629 REPORTABLE IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION

CIVIL APPEAL No. ……………./2026 @ D.No.5988/2026

CA RAMCHANDRA DALLARAM CHOUDHARY …APPELLANT

ADANI INFRASTRUCTURE AND DEVELOPERS …RESPONDENT PRIVATE LIMITED

J U D G M E N T

DIPANKAR DATTA, J.

1. This is an appeal under Section 62 of the Insolvency and Bankruptcy Code, 20161, at the instance of the liquidator of a corporate debtor under liquidation. Under challenge is the judgment and order dated 08th December, 20252 passed by the National Company Law Appellate Tribunal, Principal Bench at New Delhi3 in Comp. App. (AT) (Ins) No.2316 of 2024.

1 IBC 2 impugned order 3 NCLAT Digitally signed by MANIK KUMAR Date: 2026.06.08 17:14:21 IST Reason: Signature Not Verified

2. Having regard to the point on which we propose to decide the appeal, we see no reason to comment on the correctness or otherwise of the impugned order. 3. The appeal was presented on 29th January 2026, beyond the period of limitation prescribed in sub-section (1) of Section 62, IBC but within the grace period stipulated in sub-section (2) thereof. Office reported a delay of 7 (seven) days in filing the appeal. An application seeking condonation of the said delay has been filed. Office had also marked the appeal defective. Upon curing the defects, the appeal came to be re-filed after a further delay of 82 (eighty-two) days for which a separate application seeking condonation of delay in re-filing has also been filed. 4. At the outset, it must be borne in mind that the scheme of limitation under the IBC is a strict and time-bound one. The concept of condonation of delay itself is alien to the statutory framework beyond the period expressly contemplated under the statute. Section 62 of the IBC permits an appeal to be filed before this Court within 45 (forty-five) days, with a further grace period of only 15 (fifteen) days, and that too, only upon sufficient cause being shown. Thus, the outer limit statutorily permissible is 60 (sixty) days, beyond which the appeal itself becomes barred and the Court’s jurisdiction to condone the delay ceases. 5. The importance of strict adherence to timelines under the IBC has been enunciated by this Court succinctly in its decision in Mobilox Innovations (P) Ltd. v. Kirusa Software (P) Ltd.4 as follows:

4 (2018) 1 SCC 353

36. … Even in appeals to the Supreme Court from the Appellate Tribunal under Section 62, 45 days' time is given from the date of receipt of the order of the Appellate Tribunal in which an appeal to the Supreme Court is to be made, with a further grace period not exceeding 15 days. The strict adherence of these timelines is of essence to both the triggering process and the insolvency resolution process. … .

6. Time bound resolution is the essence of the IBC was reiterated in respect of an appeal under Section 61 thereof in Kalparaj Dharamshi v. Kotak Investment Advisors Limited5 in the following words: 158. This Court has held, that it is not open to the adjudicating authority or appellate authority to reckon any other factor other than specified in Sections 30(2) or 61(3) of the I&B Code. It has further been held, that the commercial wisdom of CoC has been given paramount status without any judicial intervention for ensuring completion of the stated processes within the timelines prescribed by the I&B Code. … . (emphasis ours)

7. Reference can also be made to the decisions in National Spot Exchange Ltd. v. Dunar Foods Ltd. (Resolution Professional)6, V. Nagarajan v. SKS Ispat & Power Ltd7 and Tata Steel Limited v. Raj Kumar Banerjee and Others8 which, though arising in the context of appeals under Section 61 of the IBC, reaffirm that condonation of delay beyond the period expressly prescribed by the statute itself would be impermissible. 8. Furthermore, this Court in PEC Ltd. v. M/s Phulchand Exports Private Ltd.9 held pithily as follows:

5 (2021) 10 SCC 401 6 (2022) 11 SCC 761 7 (2022) 2 SCC 244 8 (2025) 9 SCC 483 9 Civil Appeal (Diary) No. 37293 of 2022

1 There is a delay of 21 days in filing the appeal under Section 62 of the Insolvency and Bankruptcy Code 2016. The delay is beyond the maximum period which is condonable in terms of the statute. 2 Hence, the civil appeal is dismissed on the ground of limitation. 3 Pending applications, if any, stand disposed of.

9. In Saturn Ventures and Advisors Pvt. Limited v. S. Gopalakrishnan10, delay of two days in presentation of an appeal under Section 62 of the IBC was not condoned reasoning that the Court has no power to condone the delay. 10. Let us now ascertain what the position is under the Supreme Court Rules, 201311. Sub-rules (3) and (4), of Rule 6 of Order VIII, SCR, lay down the regime governing re-filing of, inter alia, petitions and appeals after curing defects. A period of 28 (twenty-eight) days is earmarked for curing of defects. A litigant not curing the defects within 28 (twenty-eight) days may re-file the petition or the appeal, as the case may be, together with an application seeking condonation of re-filing delay. Needless to observe, condonation of re-filing delay for petitions and appeals is discretionary. 11. Is it open to this Court [where an appeal under Section 62, IBC is filed within time, i.e., 45 (forty-five) days or beyond the said period but before expiry of 60 (sixty) days as contemplated in the sub-sections thereof and are marked defective, for whatever reason] to condone the delay in refiling of the appeal when the defects pointed out are not cured within 28

10 2025 SCC OnLine SC 2484 11 SCR

(twenty-eight) days? This was the question we posed to Mr. Fernandes, learned senior counsel for the appellant to answer. 12. Mr. Fernandes contends that the appellant is a neutral officer acting under the aegis of this Court for the benefit of all stakeholders as well as the corporate debtor under liquidation and having regard to the nature of duties imposed on him, the insignificant delay in filing the appeal as well as re-filing thereof ought to be considered liberally rather than strictly. He also contends, notwithstanding that the defects were not cured within 28 (twenty-eight) days of such defects being notified, this Court’s power to condone re-filing delay of any number of days beyond 28 (twentyeight) days is not fettered and if sufficient cause be shown to exist, which did preclude a party from acting within the timelines provided in the IBC, re-filing delay of any length of time is invariably condoned. According to him, under the SCR, delay in re-filing after curing of the defects is treated differently from delay in initial filing. If initially the appeal is filed within 45 (forty-five) days, or even within the grace period of 15 (fifteen) days and sufficient cause for condonation of filing delay is shown, the Court would generally condone the delay – in filing and re-filing - if the same is satisfactorily explained. 13. Mr. Fernandes has, in this connection, invited our attention to a coordinate Bench decision between the same parties in CA Ramchandra Dallaram Choudhary v. Adani Infrastructure & Developers (P) Ltd.12 where re-filing delay in filing an appeal before the NCLAT under

12 2025 SCC OnLine SC 1406

Section 61 of the IBC was condoned. Particular reliance was placed on the following passages: 9. Be that as it may, it is well-recognised principle of law that the courts view applications relating to lawyer's lapses more leniently than applications relating to litigant's lapses. The classic example is the difference in approach of courts to applications for condonation of delay in filing an appeal and applications for the condonation of delay in refilling the appeal after rectification of defects. Useful reference may be made to the decision of the co-ordinate Bench of this Court in Perumon Bhagvathy Devaswom v. Bhargavi Amma [(2008) 8 SCC 321; 2008 SCC OnLine SC 1049.] 10. Having regard to the fact that the appellant despite limitations had done all that was necessary for filing of the appeal within 30 days, and then 15 days, i.e., within the prescribed and extended period of limitation, respectively, as well as dependency of the appellant on its lawyers who, in turn, were dependent on their clerk to refile the appeal, and there were some missteps contributing to the present situation, coupled with the fact that the issue sought to be raised by the appellant in the appeal filed before the National Company Law Appellate Tribunal, if answered in its favour, would enure to the benefit of the debtors, and also that better justice is always achieved when a lis is decided on a contested hearing rather than on default, we need to take an overall view of the matter. We are of the considered opinion that the words “sufficient cause” in this case ought to have been construed liberally and that interest of justice would be best served if, upon condonation of delay in refilling of the appeal, the National Company Law Appellate Tribunal proceeds with the hearing of the appeal on merits. Ordered accordingly.

14. We propose to advert to the decision in CA Ramchandra Dallaram Choudhary (supra) a little later. 15. Having regard to the statutory scheme of the IBC, since validated by this Court in numerous decisions by holding that the strict timelines are meant to prevent misuse by dilatory tactics, it is difficult to accept Mr. Fernandes’ contention. It is axiomatic that an appeal under Section 62 of the IBC to be regarded as having been instituted within the prescribed period of 45 (forty-five) days must be a defect-free appeal, which is

capable of being acted upon by the Registry for being immediately placed before the appropriate Bench for consideration. Any appeal which is not filed within the stipulated period in a form shorn of defects, for all practical and legal purposes, remains a defective appeal. 16. Can or should a litigant be permitted to circumvent the rigours of limitation by filing a defective appeal as a device to save limitation and, thereafter, to opt to cure the notified defects at leisure? Can or should this Court countenance such a practice? The answers to both questions have to be a resounding ‘NO’. To hold otherwise would defeat the object of the IBC and render nugatory the discipline of timelines engrafted both in Section 62 as well as the SCR. Any such practice of filing a defective appeal, if encouraged, could result in a litigant dragging the process of re-filing for months and still being heard on his application for condoning re-filing delay premised on the ground that the IBC says nothing about re-filing delay and that the SCR being a procedural law must be read in a manner to aid the rendering of substantive justice to a party who is shown to be above board. 17. Consequently, no litigant can be permitted to subvert the statutory scheme by seeking condonation of re-filing delay beyond the period of 28 (twenty-eight) days after having initially lodged a defective appeal. Once the window of 60 (sixty) days prescribed by the IBC, followed by the window of 28 (twenty-eight) days in re-filing the appeal upon curing of defects permitted by the SCR is shut, the right to appeal stands extinguished.

18. The argument that the SCR does not impose a cap beyond which re-filing delays cannot be condoned and, hence, it is the acceptability of the cause shown amounting to ‘sufficient cause’ which is and should be decisive, irrespective of the length of time taken to cure the defects, is equally unimpressive. The SCR is the subordinate legislation in the field and whenever the IBC and the SCR clash, the latter cannot override the express provisions of the former. The IBC must prevail being the statutory edict. Though indisputable that the standards for examining a prayer for condoning a re-filing delay is certainly less rigorous than a filing delay but such standard would stand true and be applicable for the general laws, like proceedings arising from the Codes of Civil and Criminal Procedure, as well as from remedies provided by the Constitution of India. Section 62, IBC is, however, a complete code in itself for filing of appeals and is different from other laws. An appeal under Section 62, IBC does not remain alive after the 28 (twenty-eight) day period allowable under the SCR for curing defects and the lis would stand frozen once the defects are not cured within such period. An extended window cannot be granted de hors the legislative intent behind stipulation of the strict timelines in the IBC. 19. We may also observe that the fact of the appellant being a neutral officer acting under the aegis of this Court for the benefit of all stakeholders and the corporate debtor under liquidation is not sufficient for us to invoke our extraordinary jurisdiction under Article 142 of the Constitution to dilute or override the express statutory timeframes engrafted under the

IBC. Pertinently, the IBC does not mark a different threshold for officers like the appellant and hence, reading words into the statute which are not used by the legislature would not be a permissible interpretational exercise. 20. Moving on to the decision in CA Ramchandra Dallaram Choudhary (supra), which has been pressed into service by Mr. Fernandes, the peculiar factual matrix of the said appeal assumes significance and warrants a recapitulation of the events. a. Appellant had earlier challenged the order dated 21st June, 2024 passed by the National Company Law Tribunal13 before the NCLAT in an appeal under Section 61, IBC. However, the appeal before the NCLAT itself was not filed within the prescribed period and was beset by delay in re-filing. b. Vide its order dated 6th February, 2025, the NCLAT declined to condone the delay. Aggrieved thereby, the appellant approached this Court by filing an appeal14 under Section 62, IBC. This Court, by its order dated 5th May, 2025, set aside the order of the NCLAT and remanded the matter for consideration on merits, whereupon the NCLAT proceeded to decide the appeal and delivered the impugned order.

13 NCLT 14 Civil Appeal No. 5106 of 2025

c. Significantly, while concluding its order dated 5th May, 2025, this Court specifically recorded that such order is not to be treated as a precedent. 21. It would, therefore, appear that notwithstanding the indulgence shown by this Court to the self-same appellant at an earlier stage, the appeal presently under consideration has been re-filed after substantial delay. The explanation for the re-filing delay reads as follows: 4. That it is most humbly submitted that essentially the delay in refiling arose due to an internal oversight within the Office of the Liquidator. While the defects were duly communicated by the Registry, a concerned officer within the Liquidator's office either mistakenly believed that the requisite details had already been conveyed or did not promptly relay them to the Advocate-on Record. It is also pertinent to mention that this officer has since left the position, leading to a gap in communication. The delay, thus, was neither intentional nor negligent but arose from a bona fide administrative lapse within the office. (emphasis ours)

22. The circumstance that this Court had earlier interdicted refusal of the NCLAT to condone the delay in re-filing the appeal under Section 61 of the IBC does not advance the appellant’s case, rather even on a cursory comparison of the two situations, it only accentuates the reason as to why the earlier exercise of discretion cannot be extended to the present proceedings. While setting aside the order of the NCLAT, this Court had emphasized the differing degrees of liberality, which ought to be extended in the cases of lapses attributable to the advocate-on-record and to the litigant, as far as re-filing delay is concerned. It was in this factual milieu, the controversy warranted examination on merits, thereby

necessitating the condonation of delay in re-filing of the appeal before the NCLAT and restoration of the appeal before it. 23. The decision in CA Ramchandra Dallaram Choudhary (supra) reiterates the principle which must guide the exercise of judicial discretion in matters of condonation of delay. The present case stands on an entirely different pedestal, wherein the appellant seeks condonation not merely of delay in re-filing but also of delay in invoking the appellate jurisdiction of this Court under Section 62, IBC. Importantly so, the appellant approaches this Court after having availed the benefit of a liberal construction of “sufficient cause” at the previous stage of the same litigation. A litigant who has once secured indulgence in relation to delay cannot legitimately proceed on the assumption that further defaults engendered at the next appellate stage would automatically attract a similar exercise of discretion. To hold otherwise would render the law of limitation under the IBC progressively elastic at every successive stage of challenge, defeating the legislative objective of expedition and finality. 24. Restating what has already been enunciated, the appellant can derive no advantage from the earlier order condoning the delay in re-filing the appeal under Section 61, IBC before the NCLAT. That exercise of discretion was confined to the peculiar facts of that case and cannot be construed as a warrant for repeated indulgence. The discipline of limitation, particularly in the context of the IBC, does not countenance serial condonations of delay across successive appellate stages. Having once availed the benefit of a liberal approach, the appellant cannot

legitimately seek a further relaxation when the present appeal under Section 62 is itself beset by delay both in filing and in re-filing. 25. To sum up our discussion, 45 (forty-five) days is available under subsection (1) of Section 62, IBC from date of receipt of the order of the NCLT to file an appeal involving a substantial question of law before this Court. As per sub-section (2), subject to sufficient cause being shown, the Supreme Court may allow an appeal to be filed within 15 (fifteen) days after the expiry of the said 45 (forty-five) days but not beyond. Curing of defects arising out of a defectively filed appeal under Section 62, IBC is permissible within 28 (twenty-eight) days of notification thereof by the Registry. If the defects are cured within 28 (twenty-eight) days, the appeal would deserve registration upon removal of the “D No.”. However, there being no scope for curing defects after lapse of the period of 28 (twenty-eight) days in respect of an appeal under Section 62, IBC, filing of an application for re-filing delay does not arise. Consequently, no question of condonation of delay [even for a day beyond 60 (sixty) days (in case of an appeal which, apart from the little delay in filing beyond 45 (forty-five days), is otherwise defect-free) and 28 (twenty-eight) days (in case of a defective appeal)] arises for consideration. 26. Thus, the legal position being settled beyond cavil, it is unnecessary for us to venture into the merits of the explanations furnished in support of the applications for condonation of delay in filing and re-filing herein. Where the statute itself erects an insurmountable jurisdictional bar, no

enquiry into the adequacy of the cause shown would alter the legal consequence that inexorably follows. 27. Apart from what has been held above, upon a perusal of the applications seeking condonation of delay in filing and in re-filing, we find sufficient cause not having been shown to satisfactorily explain the delay(s). Absent any cogent or convincing justification, the delay(s) in both the filing of the defective appeal and re-filing of the appeal are not liable to be condoned. 28. Be that as it may, the defective appeal stands dismissed as time-barred having been filed beyond the maximum period condonable in terms of the IBC. 29. Connected applications too stand dismissed.

………..……………………………J. (DIPANKAR DATTA)

…….……..…………………………J. (SATISH CHANDRA SHARMA) NEW DELHI; JUNE 01, 2026.

AI-assisted summary, reviewed and verified by our editorial team.

In the Court's words

“The outer limit statutorily permissible is 60 (sixty) days, beyond which the appeal itself becomes barred and the Court's jurisdiction to condone the delay ceases.”
“No litigant can be permitted to subvert the statutory scheme by seeking condonation of re-filing delay beyond the period of 28 (twenty-eight) days after having initially lodged a defective appeal.”
“Where the statute itself erects an insurmountable jurisdictional bar, no enquiry into the adequacy of the cause shown would alter the legal consequence that inexorably follows.”
“The discipline of limitation, particularly in the context of the IBC, does not countenance serial condonations of delay across successive appellate stages.”

Need help with your case?

Facing a similar legal challenge in the Supreme Court or High Court? Connect with our pro bono volunteer advocates today.

Related Supreme Court services

Request Free Callback
Litigation India

Insight First, Action Next. A public-service initiative to make justice understandable for every Indian.

contact@litigationindia.com

+91 9956486585

New Delhi, India

Quick Links

Our Mission

To empower ordinary citizens, litigants, and junior advocates across India by translating complex Supreme Court of India judgments into editor-verified, plain-language summaries in both English and Hindi. We aim to bridge the gap between judicial proceedings and everyday citizens by delivering verified legal insights and offering free, pro bono guidance from experienced Supreme Court advocates—ensuring no individual suffers injustice merely for lack of correct guidance.

Legal Disclaimer: The information provided on this website is for general informational purposes only and does not constitute legal advice. Accessing this website or receiving any guidance does not create an attorney-client relationship. A formal attorney-client relationship is established only upon signing a formal engagement agreement with a lawyer. Litigation India is an informational platform — it does not provide legal representation, legal services, or legal advice.

Disclaimer: These summaries are provided for general public understanding only and do not constitute legal advice. Please consult a qualified advocate before acting on any information relating to your specific matter.

© 2026 Litigation India. All rights reserved.